|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Shearbox test
- specimen data |
Location |
|
Job ref. |
|
Borehole/Pit
no. |
|
Soil
description |
|
Sample No. |
|
Depth |
|
|
Date |
|
Test
method BS1377: Part 7: 1990
5/15/94 4/5* |
|
|
|
|
|
|
|
|
Procedure |
|
4.5.4/4.5.5/5.5.4/5.5.5 |
|
|
|
|
|
|
|
|
Machine
no. |
|
Type of specimen |
|
undisturbed/compacted/loosely
deposited* |
Preparation
procedure |
|
|
|
|
|
|
|
|
|
|
|
Weighings |
|
g |
Initially |
After test |
Nominal dimensions |
Wet soil +
cutter + tray* |
g |
|
|
Length |
L1 mm |
|
Dry soil +
cutter + tray* |
g |
|
|
|
L2 mm |
|
Cutter + tray |
g |
|
|
Area |
A mm2 |
|
Wet soil |
g |
|
|
Height |
H mm |
|
Dry soil |
g |
|
|
Volume |
V cm3 |
|
Water |
g |
|
|
Particle |
|
|
Moisture
content : measured % |
|
|
|
density |
psMg/m3 |
|
|
|
trimmings % |
|
|
Sketch showing specimen location |
|
|
Density |
|
|
Mg/m3 |
|
|
in original sample |
|
|
|
|
Dry density |
|
Mg/m3 |
|
|
|
|
|
|
|
|
Voids ratio |
|
e |
|
|
|
|
|
|
|
|
Degree of
saturation |
% |
|
|
|
|
|
|
|
|
Initial mass |
|
|
|
|
|
|
|
|
of disturbed soil* |
g |
|
|
|
|
|
|
Mass of soil
remaining |
g |
|
|
|
|
|
|
|
|
Mass of
specimen |
|
|
|
|
|
|
|
|
Shearbox
details and setting up |
|
|
|
|
|
|
|
|
|
|
Top of box to
top of baseplate |
h1 mm |
|
Top of load cap above |
|
Top of box to
top porous plate |
h2 mm |
|
top of box, unloaded |
h3 mm |
|
Top of load cap above |
|
Combined
thickness of plates |
tp mm |
|
top of box, with yoke |
h4 mm |
Sample
thickness Ho = h1 - (h2+tp) |
mm |
|
Settlement under loading yoke |
mm |
|
Mass of load
hanger |
m1 kg |
|
Initial reading of vertical |
|
Lever ratio |
r |
|
deformation gauge |
R1 |
Mass on hanger |
m2 |
kg |
r* m2 = kg |
|
Zero reading of gauge R0 |
|
|
|
|
= R1
+/- ( h3 - h4) |
Total mass on
specimen |
|
m kg |
|
|
|
|
|
|
|
Normal stress |
sn=9810m/A = |
|
kPa |
|
|
|
|
|
|
|
* Delete as
appropriate |
|
|
|
Operator |
Checked |
Approved |
|
|
|
|
|
|
|
|
|
|
|
|
Form 7A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|